Write a status update for the project sponsor from the transcript. Under 150 words. Three sections: Decisions, Action items (each with owner and due date), Open questions. Include nothing that is not stated in the transcript.
Four criteria, each scored 0 to 2 (as a decimal or floating point number). Maximum 8. Pass is 6 or more with no zero.
| Criterion | 2 | 1 | 0 |
|---|---|---|---|
| Completeness | all decisions and all action items stated in the transcript are present | one missing | two or more missing |
| Fidelity | nothing invented; items raised then withdrawn are excluded; a figure stated two ways is flagged or omitted, never silently picked | one slip | any fabricated fact, or the conflicting figure silently picked |
| Format | under 150 words; the three named sections; owner and date on every action item | one miss | two or more misses |
| Audience fit | a sponsor who missed the meeting can act on it; no transcript language, no names of who said what | readable but leaks meeting talk | reads as notes, not an update |
<aside> ✅
Pass: Launch moved to 14 Nov. Marketing delivers final copy by 7 Nov (Priya).
</aside>
<aside> ❌
Fail: Dan said he thinks we should probably push launch, and Priya agreed she could get copy done.
</aside>
Score each criterion with one sentence of justification. Post the four scores and sentences as a Todoist comment starting with GRADE from <your name>:, then add one row to the Evals database. Never grade your own task.
v1 (round 1): as above.
v2 (round 2): Format gains one rule. An action item whose owner is not stated in the transcript is listed with owner Unassigned. Guessing an owner scores 0 on Fidelity.